NEWS DETAILS

Date: 20/09/2024

APM Terminals Pipavav lifts monsoon season restriction on maximum permissible vessel drafts

APM Terminals Pipavav has lifted the restriction on maximum permissible vessel drafts during the monsoon season (1 June-15 September), as per a communique.
 
The port can now accommodate vessels at berth as follows:
 
*Type of Vessel: Container
 
Berth: GP4
 
LOA: 367 metres
 
Beam: 50 metres
 
Displacement: 150,000 MT
 
Draft: 14.5 metres
 
* Type of Vessel: Container
 
Berth: GP3
 
LOA: 315 metres
 
Beam: 50 metres
 
Displacement: 100,000 MT
 
Draft: 14.0 metres
 
* Type of Vessel: Bulk
 
Berth: GP1 / 2
 
LOA: 240 metres
 
Beam: 40 metres
 
Displacement: 100,000 MT
 
Draft: 14.0 metres
 
* Type of Vessel: Tanker
 
Berth: Liquid
 
LOA: 240 metres
 
Beam: 40 metres
 
Displacement: 50,000 MT
 
Draft: 12.0 metres
 
Source: Exim News Service: Pipavav (Gujarat), Sept. 19